WWTP Karlovac and Duga Resa
Design, build and commissioning
- Capital infrastructure project with a high level of complexity
- Project value: €14.582.000
- Waste water treatment plant capacity: 98.500 PE (population equivalent)
- Level 3 treatment (mechanical treatment, biological treatment, sludge treatment and biogas treatment and utilization)
- Sludge treatment and biogas line
- Applied technology: typical secondary sedimentation
- The work was carried out on turnkey basis